Selected Dashboard: Tick Free NH https://tickfreenh.org/?gad_source=1&gclid=EAIaIQobChMI4aLmr5behwMV
You have been hired as the company safety officer to develop and implement the program required by OSHA, which includes all contractors on site and reflects the actual conditions. The new office/training facility is four (4) stories high. The ongoing construction activities include concrete masonry units (CMU) block exterior walls and a sloped standing seam metal roof on the exterior, along with underground utility installation requiring excavations and crane operations. The masons work from scaffolding, and the roofers are tied off to anchor points. They access the roof area using aerial lifts or the exterior stair tower on the south end. In the interior of the building, framing and drywall are being installed, the electricians are working to install permanent power, and the plumbers and HVAC trades are working from ladders to install their work. Lighting is temporary string lights. The elevator has not been installed yet. However, there is an exterior material lift that also carries the workers to their respective floors where they are working. The stairs have not been installed on the upper floors, and access is gained by using ladders in floor openings that will eventually be covered. What would be good examples of types of potential emergencies and responses / actions for this construction site: Fire Hazards? Falls from Height? Structural Collapse? Equipment Emergencies (Crane Collapse)? Natural Gas Leak or Explosion? Chemical Releases? First Aid and medical emergencies? Weather event / natural disasters? Workplace violence? Other emergencies and responses?
******CLICK ORDER NOW BELOW AND OUR WRITERS WILL WRITE AN ANSWER TO THIS ASSIGNMENT OR ANY OTHER ASSIGNMENT, DISCUSSION, ESSAY, HOMEWORK OR QUESTION YOU MAY HAVE. OUR PAPERS ARE PLAGIARISM FREE*******."
