Image transcription text Case Study You are the newly hired
Image transcription text Case Study You are the newly hired safety manager, who joined ABC Pre Lid, which specialises in the maintenance, repair, and overhaul (MRO) of commercial ai… Show more Image transcription text 3. During disassembly processes, the engine technician was required to extend his arm underneath the engine, to drain the engine oil sumps and remove the o… Show more There were several lagging indicators that contributed to unsafe conditions or unsafe acts in the plant, such as: • Lack of control on the usage and storage of chemicals as well as inadequate training of the users on the chemical • Insufficient control measures associated with ergonomic risk (back strain injuries, forceful application, awkward postures) • Lack of control measures on cut injuries, radiation exposure and usage of power tools • Lack of preventive maintenance on emergency response apparatus • Exposure to chemical “smell” and welding fumes As external audit by the certification body is due to commence in three months’ time. In view of the preparation for the ISO 45001:2018 audit, ABC Pte Ltd management team has tasked you to lead a team of internal auditors to perform management system audit on the entire plant. The internal audit team has completed a ONE (1) day audit. You, as the lead auditor, are required to conduct a closing meeting with the ABC Pte Ltd management team. Examine the following in a table format and appraise the non-conformance findings. • Description of the nonconformity • Evidence • ISO 45001 clause and requirement • Propose corrective actions for non-compliance
******CLICK ORDER NOW BELOW AND OUR WRITERS WILL WRITE AN ANSWER TO THIS ASSIGNMENT OR ANY OTHER ASSIGNMENT, DISCUSSION, ESSAY, HOMEWORK OR QUESTION YOU MAY HAVE. OUR PAPERS ARE PLAGIARISM FREE*******."